Seamlessly integrated energy-efficient, and secure building with expert electrical, safety, and compliance solutions.

Project Details:

The BMS site is located at Moreton in the Wirral, United Kingdom. The site currently provides a research and development facility for BMS’s pharmaceutical business needs.

Building 5 consisted of a mixed accommodation and storage space. In addition, a number of specialist stability lab areas are being relocated from other buildings on site to building B5.

These stability labs were constructed by a specialist manufacturer with PCI installing MEP services and fully-integrating them with the stability chambers, including the complex environmental monitoring system (REES System).

Building B5 also accommodated a medical facility, an employee’s fitness suite, and staff facilities including shower rooms, changing rooms and a quiet / multi-faith area. The building also be provided storage facilities for the lab staff and general FM stores.

The following services were installed by PCI:

  • Building Management System (BMS)
  • Wiring for REES monitoring system
  • Fire protection Systems
  • LV distribution and small power supplies
  • LED Lighting, external lighting and emergency lighting
  • LED Feature colour changing lighting
  • PV Installation ·
  • Fire detection and alarms
  • Data cabling and containment
  • CCTV coverage
  • Access control and intruder alarm systems
  • Lightning protection
  • Earthing and bonding
  • Lifts
  • Testing, commissioning and demonstrations of each system
  • Input to Building Regs submissions
  • Provision of as fitted drawings and O&M manuals
  • Record documents and maintenance manuals

Latest Projects.

Power your next project success with PCI.

Send a message or phone 0151 227 1012